Department of Chemical and Biological Engineering
University of Wisconsin - Madison

Direct Measures; or Performance Indicators

Specific activities have been identified in several classes that allow evaluation of the level of achievement of the Program Outcomes. These may be particular homework or exam problems, or may be an assessment made by the TA or instructor at the end of an activity. These separate scores may also be part of the course grade, but are recorded separately. These measures were implemented in 2005 and called "Direct Measures". Current ABET parlance calls them "Performance Indicators". Both terms are used interchangeably by our Assessment Team, depending on the background of an audience.

CBE 250 - Introduction to Process Synthesis measure criteria and results: Spring 2005 , Fall 2005 , Spring 2006 , collected results through Spring 2012

CBE 324 - Transport Laboratory measure criteria and results: Fall 2005 , Spring 2006 , collected results through Spring 2012

CBE 424 - Operations and Process Laboratory measure criteria and results: Summer 2005 Session 1, Summer 2006 Session 2 , collected results through Spring 2012

CBE 450 - Process Design measure criteria and results: Fall 2005 , Spring 2006 , collected results through Spring 2012

CBE 470 - Process Design measure criteria and results: Fall 2005 , Spring 2006 , collected results through Spring 2012

 

return to Assessment Homepage

Date Created: June 10, 2006
Last Modified: October 12, 2012
Content By: Thatcher Root
Markup By: Thatcher Root
Accessibility